Industroprema d.o.o. delivered a distribution submarine three-wire cable for a nominal voltage of 20.8/36 (42) kV for HEP ODS d.o.o. A cable 12,260 meters long and weighing about 180 tons was laid from Bogomolje on the island of Hvar to Čaklja in the Municipality of Podgora. This 35 kV three-core cable with EPR insulation and integrated optical fibers is the first such project to be carried out exclusively with HEP’s resources, significantly increasing the reliability of the supply of the eastern part of the island of Hvar.